年度电梯奖:大都会信托大楼现代化改造项目
Elevator of the Year: Modernization of the Metropolis Trust Building

原始链接: https://www.starelevator.com/projects/star-elevator-modernization-of-the-metropolis-trust-building

位于旧金山市场街 625 号的大都市信托大厦(Metropolis Trust Building)是一座一级历史地标。该大厦近期完成了一项复杂的电梯现代化改造工程,并荣获了《电梯世界》(Elevator World)颁发的“年度项目奖”。 该大厦建于 1907 年大地震之后,其原始的垂直交通系统因机械设备老化及地震安全隐患,导致运行频繁中断,其中一部电梯甚至被迫停用。为了提升租户满意度并加强结构完整性,大厦管理方寻求进行一次全面的升级改造。 Star Elevator 公司承担了这一 15 层高的改造挑战,克服了对百年基础设施进行翻新的固有复杂性。项目包括多项重大升级,如安装符合抗震标准的全新轨道系统、现代信号装置以及更新轿厢内部装饰。工程中一项重大的技术难点在于拆解原始工匠遗留下来的、令人困惑的 1907 年“交叉式”钢缆系统。凭借专业的工程技术与不懈努力,Star Elevator 成功实现了世纪初工艺与 21 世纪安全标准的衔接,确保了这座历史地标在第二个世纪依然能够正常运行。

抱歉。
相关文章

原文

Elevator World Project of the Year Winner, for elevator modernization!

San Francisco in 1907. The City is still shaken from the aftermath of one of the most significant earthquakes of all time.  However, The City is surging back to life; rising from the rubble. New building projects are in motion – modern structures will soon line Market Street.

Today, The Metropolis Trust Building sits amongst the most expensive real estate in San Francisco.  625 Market is a designated Category 1 Historic Landmark with a vertical transportation system still anchored in the past –a retrofit of machinery installed over 100 years ago.

21st century safety concerns meet turn-of-the-century building techniques. And there’s no app to solve this one. The elevator systems were all operating well beyond their expected life.

Situation

Project parameters included upgrading the rail systems to bring them up to modern seismic code. New pushbutton and signal fixtures, and modern cab interiors would also be added.

Elevators were not operating reliably –
issues with machine bearings and motor commutators kept cars out of service. In fact, car #1 had been intentionally disabled due to reliability concerns.

Building Management was intent on tenant satisfaction, safe operation, and improved structural integrity, as the historic building approached its second century of operation.
Enter Star Elevator. Despite the project’s inherent complexity, the team was not afraid to roll up its sleeves to solve the 15-story challenge.

The criss-cross crisis

First order of business was untangling the tricks of 1907 tradesmen – including a confounding criss-cross cable system.
 

联系我们 contact @ memedata.com